Equipment and machinery

Plan now for green energy supplies on site

Le long de l’autoroute A15 aux Pays-Bas, la plus grande station de recharge rapide au monde pour le matériel lourd est actuellement en construction.
Le long de l’autoroute A15 aux Pays-Bas, la plus grande station de recharge rapide au monde pour le matériel lourd est actuellement en construction.

Zero-emission machines are not yet commonplace in Belgium. But that could soon change, according to trade association Sigma. At its New Year reception, its president, Dries Van Haut, announced the creation of the ‘Greening Working Group’.

The working group will develop answers to contractors’ questions, such as: ‘How can a fleet of electric machines be recharged during the construction of a new road?’ and ‘How can hydrogen supplies be organised on site?’ According to Sigma’s president, there are no off-the-shelf solutions to these questions today, but they need to be addressed in the short term as part of the drive for sustainability, energy savings and reduced harmful emissions. Dries Van Haut points to some promising examples already in existence. One is a construction machinery manufacturer that has developed its own hydrogen supply vehicle to fuel the hydrogen-powered machines it plans to build. 

Dries Van Haut, president of Sigma: ‘There are initiatives and support measures in Belgium, but they are often little known.’

Charging points for heavy equipment

‘Solutions are also being developed for electric equipment,’ says Dries Van Haut. ‘I recently read in an article in Cobouw that a consortium of contractors, working with an energy cooperative, is building the world’s largest fast-charging facility for heavy equipment alongside the A15 motorway in the Netherlands. Thanks to the nearby wind turbines, construction machinery will be able to charge at one of the 39 fast-charging points.’

Consultation on support measures

‘There are initiatives and support measures in Belgium, but they are often little known,’ Dries Van Haut continues. ‘That is why we set up this working group within Sigma. It will first map the technologies that are mature on the market or will be shortly, and then examine the support measures already in place. In the meantime, consultations are taking place with the Flemish Government to determine whether additional support measures can be introduced. We will certainly keep you informed.’     

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectEquipment and machinery
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.